Case Study – Charing Cross Road, London Knauf GifaFloor

Ilona Rose House, 111-119 Charing Cross Road, London

Timescales: March 2022 – September 2022

Project Size: 1200 m2

Products: Knauf GifaFloor FHB32 on M16 pedestals + accessories & GifaFloor Access Hatch

Client: The Raised Access Flooring Company

Knauf GifaFloor system installed on pedestals at various void heights. In addition, a GifaFloor access frame

A total of 11 call offs to site, delivered on time via our dedicated FORS transport vehicles, to maintain programming as requested.

The use of the GifaFloor system in this instance offers the following benefits:

  • The installation of a solid, load bearing floor at an exact height – much quicker than using traditional screeds
  • Improved programming times as there is no waiting times for wet materials to set
  • Less health & safety risk
  • Flexibility of access hatches where they may be requirements for access to specific areas within the hollow floor
  • The ability to be able to apply almost any finish directly to the panel
  • Using products that are manufactured from a sustainable source

Great job RAFC!

Comments are closed.

Download Document×

IMPORTANT NOTICE. By submitting a request to download information, you are granting Access Floors Distribution Ltd permission to store and process your data according to our Privacy Policy. Your information will never be sold to or shared with any third party. The data you submit will only be used in relation to your enquiry and to keep you up to date with news from AFD Ltd. You can unsubscribe from emails at any time.

Download Files×